Haldon Station
Mackenzie, South Canterbury
Lodestone Energy is partnering with Haldon Station to develop 220 MWp solar farm within the solar-rich Mackenzie District.
The 320-hectare site (at just 1.5% of the station’s 22,000-hectare property) is dry, unproductive land severely impacted by wind erosion and pests. In its favour, the location offers an exceptional solar resource, close proximity to the national grid, and a low visual impact within the area due to the natural land formations surrounding it.
The flat terrain will require minimal earthworks, and once operational, the farm will produce no emissions, generate little noise, and require minimal water, while delivering decades of clean energy. Enough to power the equivalent of over 45,000 homes per year.
Unlike Lodestone’s agrivoltaics farms, which are designed for dual-use farming, this farm will not be used for traditional farming activities. Instead, in partnership with the station owners, the site will be destocked and pest-controlled to encourage ecological restoration under the shade and shelter of the solar panels.
Status: This project has undergone rigorous pre-development evaluations and environmental assessments, alongside extensive consultation with mana whenua and a broad range of stakeholders. In August 2026, Haldon Solar Farm received final approval under the Government’s Fast-track Approvals Act — making it the first solar farm in New Zealand to be granted approval through this process.